Jacuzzi BZ00000 Manuel d'utilisateur

Naviguer en ligne ou télécharger Manuel d'utilisateur pour Articles sanitaires Jacuzzi BZ00000. Jacuzzi BZ00000 User's Manual Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer

Résumé du contenu

Page 1 - TWO WALL AND THREE WALL

SUMMER RAIN™ II2 PERSON SHOWER SYSTEMTWO WALL AND THREE WALLINSTALLATION AND OPERATING INSTRUCTIONS Jacuzzi Whirlpool Bath© BZ00000 03/05

Page 2 - IMPORTANT SAFETY INFORMATION

TOWERS AND DOORS INSTALLATIONTHESE INSTRUCTIONS ARE FOR SUMMER RAIN II2 WALL AND 3 WALL UNITS WITH AND WITHOUTAIR FEATURE OPTION.Refer to COMPONENT I

Page 3 - CONTENTS

TOWERS AND DOORS INSTALLATIONSTEP 4Place the center support rail into slot on each tower. Ifrail does not readily fit into slots, it may be necessar

Page 4 - SPECIFICATIONS

TOWERS AND DOORS INSTALLATION10Jacuzzi Whirlpool Bath© BZ00000 03/05GROUTSTUDSHIM IF NECESSARYDO NOT FILLCEMENTBOARDTILESILICONESEALANT1-1/8&quo

Page 5 - ENCLOSURE SPECIFICATIONS

STEP 9 (2 WALL ONLY)Place the side support rail into the slot on the water tower. Place the short wall rail into the slot on the other watertower. R

Page 6 - FRONT VIEW SIDE VIEW

STEP 10Two shut-off valves are provided per water tower. To hook up supply lines, unscrew valves from braided line. Usingthread sealant, screw each

Page 7 - DETAIL 1

TOWERS AND DOORS INSTALLATIONSTEP 12Move the door assembly to the door post on watertower and slide the assembly into the door post. Locatethe base

Page 8 - INCORRECT

TOWERS AND DOORS INSTALLATIONFINISH WALLEDGEOF BASEGLASS SIDEPANEL MOUNTEDPARALLEL TO EDGE OF BASEWALL POSTTAPE (3)SCREWS (3)STEP 15 (2 WALL ONLY)Pos

Page 9

TOWER AND DOOR INSTALLATIONSTEP 18 (2 WALL ONLY)Align the glass with glass jamb and insert.WALL POSTGLASSGLAZING GASKETINSIDE OFENCLOSUREAPPLY SEALANT

Page 10 - WALL POST

STEP 23Install handles as shown. Note orientation of handle.Hand tighten knob. Flat screw has a screw driver notch.Do not over tighten either knob o

Page 11 - HOLD DOWN BRACKET DETAIL

TOWERS AND DOOR INSTALLATIONSTEP 26Seal all around all bases of towers with sealant. Also seal the inside of wall posts, jambs, door posts, tile join

Page 12 - BZ00000 03/05

Note: This is a professional grade product. A knowledge of construction techniques, plumbing and electricalinstallation according to codes are requi

Page 13 - DETAIL A

OPERATIONSHOWER TOWERS18Jacuzzi Whirlpool Bath© BZ00000 03/05Shower HeadThere are three selectable positions: Jet, Normal Pul-sating, and Aerated

Page 14

OPERATIONCONTROLLERTo turn ON press ON/OFF button or turn ON water at either shower tower.The unit will then automatically go into a preheat cycle to

Page 15 - SHOWER BASE

To remove any lime scale from the shower head and body sprays, rub with your finger the outer ring of nozzles on theshower head and all nozzles on the

Page 16 - SCREWS (3)

TOWER FIXTURES REPAIR PARTS21Jacuzzi Whirlpool Bath© BZ00000 03/05TOWER ASSEMBLYWASHER (PART OF D709827)469 (5X)1011 (4X)131415161718193 (5X)2

Page 17 - TOWER AND DOOR INSTALLATION

TOWER PLUMBING REPAIR PARTS11145471061412135416112823233171591819181818ITEMNO. QTY. PART NO. DESCRIPTION1 1 Y221000 TOWER, 2 PERSON SHOWER2 3 U401000

Page 18 - (2) PER TOWER

23Jacuzzi Whirlpool Bath© BZ00000 03/05

Page 19 - TOWERS AND DOOR INSTALLATION

Printed in U.S.A. Jacuzzi Whirlpool Bath© BZ00000 03/05Printed on Recycled PaperJacuzzi Whirlpool Bath National HeadquartersP.O. Box 702168, Dall

Page 20 - SHOWER TOWERS

Jacuzzi Whirlpool BathP.O. Box 702168Dallas, TX 75370-2168WARRANTY COVERAGEJacuzzi Whirlpool Bath (the “Company”) offers the following express limited

Page 21 - AIR TOWER

RESPONSIBILITIES OF OTHERSInspecting the unit prior to installation is the responsibility of the installer or building contractor who acts on behalf o

Page 22 - MAINTENANCE

CONTENTSSpecifications _________________________________________________________________________ 2Enclosure Specifications ___________________________

Page 23 - TOWER FIXTURES REPAIR PARTS

Important: Read complete instructions before beginning installation.Each unit arrives ready for installation, equipped with base, glass and associate

Page 24 - TOWER PLUMBING REPAIR PARTS

ROUGH-IN REFERENCEShown is 2 wall left hand base. Right hand opposite. The 3 wall base has tile flange on both sides and back.ENCLOSURE SPECIFICATIO

Page 25 - BZ00000 03/05

COMPONENT IDENTIFICATIONFRONT VIEW SIDE VIEW(2 WALL ONLY )GLASS SIDE PANELGLASS DOORSRAIL BRACKET AND COVER CAP(2 WALL ONLY)(2 WALL ONLY)SIDE SUPPORT

Page 26 - Printed on Recycled Pape

PRELIMINARY ROUGH-INThe floor structure beneath the unit must be able tosupport a total weight of the unit and bather(s).Refer to page 2, SPECIFICATIO

Page 27

STEP 6With a large screwdriver and the tool included with thedrain, tighten the inside compression nut to seal thedrain pipe connection. After drain

Page 28 - Registration Card

CLEAN UP AFTER BASE INSTALLATIONTo avoid dulling and scratching the acrylic surface of the base, never use abrasive cleaners. A mild liquid detergent

Commentaires sur ces manuels

Pas de commentaire